Fire Stopping
Regus Arlington Square
Q-Mark fire stopping to penetrations, linear joints and cavity barriers across a serviced office building in Bracknell, recorded in OneTrace.
Project overview
Q-Mark fire stopping to penetrations, linear joints and cavity barriers across a serviced office building in Bracknell, completed over three days in April 2026.
SCOPE
Working from the client surveyor’s notes, seal the service penetrations, linear joints and open cavities identified across the building, logging each item as a job sheet.
WHAT WE DID
Service penetrations were sealed to 120 minutes with Rockwool ablative batt and sealant. Around 16 to 18 metres of linear joints were sealed to 60 minutes with FirePro sealant, and cavity barriers were formed with 15mm fire-rated plasterboard. Voids that needed structural work first were flagged to the client rather than filled.
OUTCOME
16 job sheets, with every item labelled and photographed before and after in OneTrace.
RELATED
Services used: Fire Stopping. Area: South East passive fire protection.
Category
Fire Stopping
Location
Bracknell, Berkshire
Duration
3 days, April 2026